Our industrial construction capabilities and experience extend beyond energy and mining. We also serve clients developing cement and aggregate plants, steel mills, pulp and paper mills, grain terminals, food processing plants, manufacturing plants and material handling systems.
TIC was awarded the contract for the erection of a 1300-W Bucyrus-Erie dragline including the setting of two 1,300 hp hoist motors, two 1,300 hp drag motors, three 640 hp swing motors, two 640 hp propel motors, one 102” diameter hoist drum, one 102” diameter drag drum, 285’ boom with a 85 1/4” sheave and all other electrical and mechanical items. Maximum hoisting load was 195,000 lbs and the working weight was 4,705,000 lbs. Man-hours totaled 84,000.
TIC was the general contractor for the installation of the wet end paper machine Bristol formers at the Georgia Pacific Gypsum Division plant.
TIC was awarded the contract for the erection of an 8050 Marion Dragline including setting of four 1,045 hp hoist motors, four 1,045 hp drag motors, four 640 hp swing motors, two 800 hp propel motors, one 96” diameter hoist drum, one 96” diameter drag drum, a 350” boom with a 120” diameter sheave and all other necessary electrical and mechanical items. Maximum hoisting load was 255,000 lbs and the machine working weight was 6,400,000 lbs
The 265 ADST/D Recycled Fiber Plant located in Wallula, Wash., utilizes a deinking process designed to produce high quality pulp that is suitable for use in fine paper grades.
TIC was awarded the contract for the erection of a B-E Model 2570-W dragline with a 340’ boom and two 110-cubic-yard buckets. Working weight of the machine was 12.5 million lbs.
Located in Newberg, Ore., TIC erected of two HRSG boilers as part of a cogeneration expansion project within the existing facility.