Header_04.jpg
TIC
Hide Search Field
Show Search Field

HAYDEN COAL HANDLING FACILITY

HAYDEN COAL HANDLING FACILITY - Hayden, Colo.

TIC was awarded the contract for the rail car unloading facility including conveyor, feeder and stacking tube to tie into existing coal handling system.

Technical Details

  • Bottom-dump rail car unloading facility, with drag feeder
  • 60” conveyor with four bents to new 100’ high slip-form stacking tube
  • Installation of two new roll crushers under the tube in the existing reclaim tunnel to tie into coal handling system
  • 26’ high x 150’ long x 52’ wide rail line main shed
  • Supplied all fabricated steel for the conveyor and bents, drives and belting and all other permanent plant material
  • Xcel supplied drag feeder and two roll crushers
Quick Links
Featured Projects
LA CYGNE GENERATING STATION
LA CYGNE GENERATING STATION
La Cygne, Kan.
Contact Kiewit

Home Office : 3555 Farnam St. Omaha, NE

Home Office : (402) 342-2052

General Info : info@kiewit.com

Locations Page   |   Career Search

Featured Projects

LA CYGNE GENERATING STATION
LA CYGNE GENERATING STATION
La Cygne, Kan.

Contact TIC

Home Office :

10055 Trainstation Circle
Lone Tree, Colorado 80124
 

 

Office : 

720-920-4200

 

Jobs Hotline : 

833-281-5273

 

Locations Page   |   Careers